⚠️ …
Sign the petition →
⚠️ Urgent: the Sophia mega solar plant is in a new public consultation — only until 21 October. Object to Sophia →

The Serra da Gardunha
is not for sale

They plan to build large-scale solar and wind farms across our region — mega-projects that will ruin our countryside. This is not our opinion: the Government’s own documents make our mountains the most targeted region in the country, with fast-tracked licences and no environmental impact assessment. The consultation has closed — now our tool is the petition in Parliament: 7,500 signatures force a debate in the Assembleia da República.

What they plan for our land

Drag and compare: today vs. tomorrow

On the left, the Marateca reservoir (Castelo Branco) as it is today. On the right, the impact simulation with the plants the acceleration zones allow. Drag the handle across the image and compare.

Impact simulation at the Marateca reservoir — solar panels and wind turbines around the water
The Marateca reservoir as it is today — surrounded by fields and forest
Today Tomorrow?

Right-hand image: impact simulation created by the campaign — not a real photograph.

More campaign images — click to open full size and share:

Simulation: solar fields on the mountainside.
Simulation: solar fields on the mountainside.
Today vs. tomorrow — simulation seen from the stone-cross viewpoint, with plants on the hillside.
Today vs. tomorrow — simulation seen from the stone-cross viewpoint, with plants on the hillside.
Project land (green) and excluded land near Lardosa — REN study area.
Project land (green) and excluded land near Lardosa — REN study area.
Today vs. tomorrow — campaign share image.
Today vs. tomorrow — campaign share image.
Campaign satire: “Pinhal Sustentável 5.0” — the pine forest replaced by solar panels.
Campaign satire: “Pinhal Sustentável 5.0” — the pine forest replaced by solar panels.
Petition in Parliament

Next goal: 7,500 — forces a full debate in Parliament’s plenary.

Sign in 1 minute

How to sign the petition

  1. Create an account. Signing requires your own account. At the top of the petition page in Parliament click «Entrar» → «Registar». Fill in your name, date of birth, ID document, email and a password, accept the terms and click «Registar».
  2. Activate the account by email. Open the message from the Assembleia da República and click the account activation link.
  3. Log in. Go back to the petition page and click «Entrar» with your email and password.
  4. Sign. Click «Assinar» at the top of the page and confirm at «assinar esta petição». ✅ Done — your signature counts toward the 7,500 that force a Plenary debate.
Consultation documents

Read the official documents

All the consultation documents, in order of publication, hosted here for easy reading — each with a short summary. The numbers and quotes on this page come from them.

📖 Read the documents — summarised and translated, section by section →

Análise e Ponderação dos Pareceres das Entidades23.06.2026 · PDFThe Government’s response to the opinions of 36 entities (172 contributions), including the reservations of Fundão and Covilhã and the unfavourable opinion of the heritage authority. Nearly two thirds of the contributions are only ‘partially accepted’ or merely ‘noted’ with no change to the Programme — citizens’ submissions will be weighed in a separate document. Consulta às Entidades — Pareceres emitidos16.06.2026 · PDFThe formal opinions of the public entities (474 pages). Several issued unfavourable or conditional opinions — oversized zones, conflicts with spatial planning, heritage, agriculture and nature conservation. The ICNF even requires removing the areas overlapping the 1 km buffer around the Serra da Gardunha Regional Protected Landscape. Começar aqui! ABC da Discussão Pública das ZAERPDFIntroductory presentation by EMER 2030 explaining in plain language what the ZAER are: the 2030 targets (20.8 GW solar, 10.4 GW wind), how projects are licensed and the timeline — public discussion in June–July 2026 and transposition into municipal plans in 2026–2028. The recommended starting point before the technical documents. PSZAER — Proposta05.05.2026 · PDFThe central document: the programme that, under the EU’s RED III Directive, designates the zones where solar and wind plants get simplified ‘single window’ licensing. It maps ~578,777 ha of potential solar zones and 84,489 ha for wind — and acknowledges that the large majority falls within the Pinhal do Centro group, which includes the Serra da Gardunha. AAE — Relatório Ambiental Preliminar05.05.2026 · PDFThe full Strategic Environmental Assessment (249 pages). It acknowledges major risks: the pressure will fall mainly on forest, farming and pasture land in low-density rural territories, unknown biodiversity values may exist within the ZAER, and legitimate opposition from local communities is a limiting factor. AAE — Resumo Não Técnico05.05.2026 · PDFPlain-language version of the Strategic Environmental Assessment: it explains the proposal opening ~7% of the territory to projects without EIA and identifies risks — pressure on low-density rural territories, cumulative impacts on landscape and biodiversity, growing social contestation. It concludes local benefits are greater with smaller projects near consumption. Relatório Temático — Ecologia05.05.2026 · PDFCIBIO-BIOPOLIS report setting the criteria for excluding the most ecologically valuable areas from the ZAER. It acknowledges that wind power kills raptors and bats through blade collisions — and admits that data on species outside protected areas is limited, which can undermine biodiversity protection. Relatório Temático — Integração de Informação Espacializada (mapas)03.05.2026 · PDFLNEG report explaining how the ZAER maps — including this page’s Figura 39 — were drawn, identifying ~371,348 ha of potential solar zones and 84,489 ha for wind. It admits limitations: land-cover data with a resolution of only 1 ha, municipal master plans not consulted, and aeronautical restrictions only approximated. Relatório Temático — Paisagem e Património Cultural02.05.2026 · PDFReveals that the ‘Pinhal do Centro’ landscape group — explicitly including the ‘Serras da Gardunha, Alvelos e Moradal’ — is the most targeted in the country, with ~34% of its area marked as potential solar ZAER (~1,372 km²). It admits large solar parks create ‘blankets of glass’ felt as significant visual degradation, and proposes capping panels at 25 contiguous ha. Relatório Temático — Energia02.05.2026 · PDFConcludes that the main brake on renewables is not a lack of land but grid access and licensing — ~8.7 GW already awarded were never connected. It recommends small, modular zones near the grid and consumption, on artificialised land — instead of large homogeneous blocks — and highlights urban rooftops (28 GW potential). Relatório Temático — Jurídico02.05.2026 · PDFAMMC Legal report designing the licensing regime inside the ZAER: single-window licensing with environmental assessment at plan level rather than project level — as a rule dispensing with a full EIA and replacing it with a mere conformity-verification procedure, with maximum deadlines of 12 months (6 for repowering). Relatório Temático — Ordenamento e Economia do Território02.05.2026 · PDFCEDRU report admitting that the identified area vastly exceeds what the 2030 targets require — and that land occupied by solar plants has already jumped from ~1,290 to ~4,740 ha in five years. It warns of land speculation and ‘energy monofunctionality’ in the interior, and recommends prioritising artificialised and degraded areas, not rural land.